Project at a Glance
120K+
contracts a year across Unilever’s global buying teams
1,500+
Unilever procurement professionals across 100+ countries
10 days → hours
for line item entry, with autofill and validation
CLIENT
Hindustan Unilever (Unilever)
COMPANY
Moglix
MY ROLE
Sole product designer, end to end
SCOPE
250+ screens in about 60 days, across two phases
PLATFORM
Enterprise web, desktop first
USERS
Buyers, legal, market collaborators, ops, admins
What a Contract Is at Unilever
Unilever buys raw and pack materials through Commercial Terms Contracts (CTCs). One CTC can carry hundreds of line items. Each is a combination of material, plant and supplier, with its own quantity, price, currency, Incoterms, payment terms and SAP condition codes.
Once a contract is agreed it moves into CLM, Unilever’s legal contract system, and its prices are published to SAP ECC, where purchasing actually uses them. iCAT sits in front of both. Its job is to make sure what reaches them is complete, consistent and approved.

Where iCAT Sits in the Contract Lifecycle
Who Uses It
Unilever’s procurement teams handle more than 120,000 contracts a year, with buyers and suppliers spread across the world. Before iCAT, buyers filled in a huge Excel sheet and worked through a fragmented legacy tool. A typical contract took 30 to 45 days to create, most of it lost to back and forth between teams.
Nothing checked the data until the downstream systems did. When CLM or SAP rejected a contract, it went back to the buyer days later, often for a mismatch that could have been caught the moment it was typed.
The expensive mistakes were the ones found last.
Hundreds of Rows, Typed One Field at a Time
A single contract could need the same material entered for dozens of plants, each with its own pricing and terms.
Mistakes Surfaced in CLM or SAP, Not at Entry
A material not mapped to a plant, or a wrong price unit, only failed once it left the buyer’s hands.
Hard to Know When Legal Review Was Needed
Unilever’s escalation policy was long and written for lawyers. Buyers either over-escalated or risked missing a trigger.
Many Contributors, No Single View
Market and legal teams worked on copies, status lived in inboxes, and ops fixed stuck contracts by hand.
What the Workshops Surfaced
Multi-layer data gathering
Complex approvals
Many stakeholders per contract
Manual validation
Illogical grouping of data
Email-based notifications
High turnaround time
No global master data search
Old contracts reused with minor changes
I was the only designer, working day to day with my PM and the engineering team, with guidance from my design manager. I visited Unilever several times to work with the teams that touched a contract.
In Their Words
“I want this application to be easy to use, update, maintain and collaborate on with hundreds of buyers and suppliers.”
VP, SUPPLY CHAIN
“A typical contract takes 30 to 45 days. There is too much back and forth between teams.”
MANAGER, SUPPLY CHAIN
“I want a system where I can validate all the data at once and collaborate with my buyer easily.”
MANAGER, SUPPLY CHAIN
What I Learned, and What It Meant
Buyers think in rows, not forms.
Their mental model was a spreadsheet. A form per line item would have meant hundreds of forms per contract, so the core surface had to be a grid.
An error costs more with every system it passes.
The same mismatch that takes seconds to fix at entry takes days once CLM or SAP rejects it. Validation had to move to the point of entry.
Legal policy was written for lawyers and answered by buyers.
The policy needed to become plain questions grouped by risk, with a clear outcome, so buyers could answer it without guessing.
A contract has one owner and many hands.
Collaboration needed explicit roles and access, inside the contract, instead of copies passed around by email.
Four rules I used to settle arguments, including my own.

Six decisions that shaped the product, with what each one cost.
5.1 A Spreadsheet-Grade Grid Instead of a Form per Line Item
Buyers had already told Unilever they were tired of filling in forms and would rather work the way they did in Excel. Line items carried more than twenty fields across seven groups: basic info, supplier, commercial, pricing validity, price conditions, SAP system details and collaboration. I grouped them into colour-coded column bands that buyers switch on and off, and kept Basic Info pinned on the left so every row stays identifiable while scrolling.

PROBLEM
Hundreds of rows, each with 20+ fields, many of them SAP codes.
CONSTRAINT
Desktop at 1366px, values that must match SAP master data exactly.
TRADE-OFF
A dense grid is fast for experts but intimidating at first. Stepped forms are friendlier but would mean hundreds of forms.
DECISION
Grid for line items, a short form for the header, and column bands so buyers only see the fields they are working on.
5.2 Bulk Entry Designed Around How Contracts Actually Start
Research showed four common starting points: a few distinct materials, the same price across many plants, a buyer who already has the material and plant list in Excel, and very large contracts. I designed a path for each instead of one generic import. Together with autofill and validation, this brought line item entry down from about 10 days to a few hours.


PROBLEM
Typing the same material for dozens of plants was the slowest, most error-prone part.
CONSTRAINT
Buyers already lived in Excel; the import had to accept their files as they were.
TRADE-OFF
Rejecting a whole file on one bad row is simpler to build, but punishes the user for 29 mistakes in 161 rows.
DECISION
Partial import: accept valid rows, report the rest with a downloadable issue file and a clear re-upload path.
5.3 Validation at the Source, Not After the Handoff
Validate runs data sanity and master data checks across the whole contract. Issues open in a side panel split into errors and warnings, each naming the section, the field and the IDs involved, and the offending cell is outlined in the grid. Buyers can also download the contract with errors marked, or mail errors straight to the people who need to fix them.

PROBLEM
Errors were found by CLM or SAP, days after entry.
CONSTRAINT
Checks had to mirror the rules of systems iCAT does not own.
TRADE-OFF
Blocking on every issue stops people working. Allowing everything moves the problem downstream again.
DECISION
Errors that a downstream system would reject block saving to CLM. Everything else is a warning the buyer can accept.
5.4 Legal Policy Rewritten as a Triage
Unilever’s legal escalation rules became three risk areas: commercial and resilience, legal and policy compliance, and innovation. Each has a Yes, No or Unsure answer backed by plain checklists, and the form ends in one clear outcome at the top: legal review is required, or it isn’t. Country-specific rules sit at the bottom where they apply.

TRADE-OFF
An Unsure option risks being overused, but a confident wrong No is worse for Unilever.
DECISION
Keep Unsure and treat it as a route to legal, so uncertainty is escalated instead of hidden.
5.5 Collaboration With Explicit Roles and Access
Collaborators are added to the contract itself as an individual or a group, with a role (market, legal, silent or co-owner), their level of access in CLM and whether they get CLM email notifications. The owner always sees who can change what.

5.6 A Console for the People Who Fix Things
CPMO operations sit between iCAT and CLM. I gave them their own view: search by contract or incident number, see every CLM input file and supporting document in one list, log an incident number, set a status manually and unlock a contract for editing.

iCAT shipped in two phases. Phase 2 was about clarity, not more features.
Phase 1 proved the core model: grid, validation, triage and collaboration. Living with it showed where people still struggled. Statuses were named after systems rather than what a buyer needs to do next, gaps only showed up when someone pressed Validate, and sharing worked at the contract level when the real work was split by line item.
Statuses in the Buyer’s Language
PHASE 1 STATUS
PHASE 2 STATUS
New / Form Entry
Draft
New in Phase 2
With collaborators
Validation Passed
Pending for review
Saved to CLM
Submitted to CLM
CLM Approval / CLM-Executed
Approval pending
CLM-Published to ECC
Published


Three Changes That Mattered


What Shipped
“After multiple attempts to solve the problem with other partners, implementation of iCAT with Moglix has been a game changer for us.”
Dhaval Buch, Chief Procurement Officer, Unilever · Source: Fashion Network, March 2019 ↗
10 days → hours
Line item entry, the biggest time sink in the old process, with autofill and validation
7 days → 2 days
Contract turnaround after launch, as reported by Unilever
~40%
Estimated efficiency gain in contract creation, per Moglix
The line item figure comes from the original project documentation. The turnaround and efficiency figures were reported by Unilever and Moglix at launch in March 2019 and weren’t independently measured, so below is what I’d track to verify them.
What I’d Measure Next
First-pass acceptance in CLM
The core promise: contracts that leave iCAT should not come back.
SOURCE · CLM STATUS HISTORY PER CONTRACT
Time from blank to Submitted to CLM
Shows whether the grid and bulk entry actually save time.
SOURCE · ICAT TIMESTAMPS
Issues per contract and time to resolve
Tells us which checks catch the most and how quickly buyers fix them.
SOURCE · VALIDATION PANEL EVENTS
Share of line items created in bulk
Measures adoption of duplicate, fill and Excel import against typing.
SOURCE · ROW CREATION SOURCE
Legal escalation rate and Unsure share
Checks the triage sends the right contracts to legal, no more and no fewer.
SOURCE · TRIAGE ANSWERS AGAINST LEGAL OUTCOMES
CPMO unlocks and manual status changes
Every manual fix points to a gap upstream worth designing out.
SOURCE · CPMO CONSOLE LOG
What This Project Taught Me
In enterprise tools the screen is rarely the problem. The problem is the handoff between people and systems.
iCAT taught me to design for the moment work leaves someone’s hands: what they need to know, what has to be true, and who picks it up next.